Arrowsmith Engineering & Consultants Ltd Incorporating Trent Aero Engineering Ltd
AC7110 Rev E – Nadcap Audit Criteria for Welding/Brazing (to be used on audits before 30 April 2017)
AC7110 Rev F – Nadcap Audit Criteria for Welding/ Torch and Induction Brazing and Additive Manufacturing (This is required for all Welding / Torch and Induction Brazing and Additive Manufacturing audits) (to be used on audits on/after 30 April 2017)
AC7110/4 Rev H – Nadcap Audit Criteria for Resistance Welding (Spot, Seam, Projection) Baseline (All audits)
Spot Welding – sheet (identify if this process is used)
Supplement F – Metallographic Evaluation of Resistance Welds (Qualification and / or Process Control) (Additional requirements)
AC7110/4S Rev E – Nadcap Supplemental Audit Criteria for Resistance Welding (to be used before 17 September 2017) U3 Rolls Royce Plc
AC7110/5 Rev H – Nadcap Audit Criteria for Fusion Welding Baseline (All audits)
Supplement D – Material – Additional requirements for titanium welding
Supplement F – Filler Materials (Additional requirements)
Supplement G – Processes using Gas (For example GTAW, PAW) (Additional requirements)
Supplement J – Tack Welding (Additional requirements)
AC7110/5S Rev D – Nadcap Supplemental Audit Criteria for Fusion Welding (to be used before 17 September 2017) U3 Rolls Royce Plc
AC7110/12 Rev F – Nadcap Audit Criteria for Welder/Welding Operator Qualification (This checklist is required if the audit includes AC7110/3, /5 or /6)
Baseline (All audits)
AC7110/12S Rev G – Nadcap Supplemental Audit Criteria for Welder/Welding Operator Qualification (This checklist is required if the audit includes AC7110/3, /5 or /6) (to be used on audits before 4 September, 2016)
U3 Rolls Royce Plc
AC7110/12S Rev H – Nadcap Supplemental Audit Criteria for Welder/Welding Operator Qualification (This checklist is required if the audit includes AC7110/3, /5 or /6) (to be used on audits on/after 4 September, 2016)
U3 Rolls Royce Plc